Overunity.com Archives is Temporarily on Read Mode Only!



Free Energy will change the World - Free Energy will stop Climate Change - Free Energy will give us hope
and we will not surrender until free energy will be enabled all over the world, to power planes, cars, ships and trains.
Free energy will help the poor to become independent of needing expensive fuels.
So all in all Free energy will bring far more peace to the world than any other invention has already brought to the world.
Those beautiful words were written by Stefan Hartmann/Owner/Admin at overunity.com
Unfortunately now, Stefan Hartmann is very ill and He needs our help
Stefan wanted that I have all these massive data to get it back online
even being as ill as Stefan is, he transferred all databases and folders
that without his help, this Forum Archives would have never been published here
so, please, as the Webmaster and Creator of this Forum, I am asking that you help him
by making a donation on the Paypal Button above
Thanks to ALL for your help!!


2bats drain 2 bats recharge.

Started by stevensrd1, May 10, 2011, 02:15:40 PM

Previous topic - Next topic

0 Members and 1 Guest are viewing this topic.

stevensrd1

Here is a video of an experiment where I run a motor with 2 aaa bats and recharge 2 other aaa bats at the same time. I give meter reading and amp test, enjoy. http://www.youtube.com/watch?v=UUmbI_-4gn4

e2matrix

I was trying something similar a while back except I don't believe I had the diode or cap in there.  I'm trying to remember if you had posted something similar before with 3 AA's charging 2 AA's through a motor?  Might have been someone else but I was trying it with car batteries through a 12 volt motor and had some interesting results using 2 on 1 or 24 volt pulses to a 12 volt battery. 

stevensrd1

Yep I posted something as such,,while back,,always trying new ways to make such work better.. Posted this one cause it seemed to work better..Back then on those older post I did not have the battery checker that did the amp test,,only way I could know such worked was retry the charged batteries running something else,,which worked well..But I like my newer designs and experiments a bit more,,got the meter now that puts the batteries under a load amp test,,good for checking if the batteries took on a charge,,how much and so on..This newer design works quite well actually,,longer you leave it running the other two batteries recharge more and more, Ive still got this experiment running,,started yesterday,,but the 2 bats Im recharging I made sure were fully drained and pos and neg crossed to completely drain them,,I usually do that.. They are already recharged,,and were when I made the video,,they are even more recharged now however, at dcv 2v setting now at 1.382  they were at 1.370 I think when I made the video and even then the battery tester meter said they were recharged,,in the green, I just left it running is all Im saying,,and they still charging up even more,,motor still turning..So guess you leave them recharging for like 14 hours get a good recharge,,leave them recharging longer this way get even better recharge..