Overunity.com Archives is Temporarily on Read Mode Only!



Free Energy will change the World - Free Energy will stop Climate Change - Free Energy will give us hope
and we will not surrender until free energy will be enabled all over the world, to power planes, cars, ships and trains.
Free energy will help the poor to become independent of needing expensive fuels.
So all in all Free energy will bring far more peace to the world than any other invention has already brought to the world.
Those beautiful words were written by Stefan Hartmann/Owner/Admin at overunity.com
Unfortunately now, Stefan Hartmann is very ill and He needs our help
Stefan wanted that I have all these massive data to get it back online
even being as ill as Stefan is, he transferred all databases and folders
that without his help, this Forum Archives would have never been published here
so, please, as the Webmaster and Creator of these Archives, I am asking that you help him
by making a donation on the Paypal Button above.
You can visit us or register at my main site at:
Overunity Machines Forum



Lords of the Ring

Started by giantkiller, January 06, 2007, 11:53:14 PM

Previous topic - Next topic

0 Members and 21 Guests are viewing this topic.

giantkiller

As usual, Marco is right on time.
Thanks.

--giantkiller.

joe dirt

How about 90 minutes  ::)


(this message will self delete in 24 hours)


Sir Dirt


Quote from: giantkiller on June 11, 2007, 12:39:45 PM
Yo Dudes!
I love these dreamscape adventures!

The Morse code protocol is based in the spacing between the clicks. Tesla showed that the kick or spark itself is an encyclopedia just waiting to be utilized between the pages/frequencies/harmonics. See that?

Let's throw another one out there.
I plan to pull my house off the grid in 90 days or 1 circuit or pull 1 fuse and feed that isolated circuit with an inverter from a tpu. I do not plan to interface with the grid by pumping power back into the power companies. This approach is the avenue to the mass market.

--giantkiller. What reality do you want?

innovation_station

joe

looks like you are having fun  any good luck with the new setup?

it will be  2 - 3 weeks and i will rejoin the team with all the propor tools to play some more and get some results i read that it is a dual trace scope i should be shopping for could some one post some specks on the scope i should be buying for testing the rings i have no experience with a scope but want to buy the right scope any help would be great

is
To understand the action of the local condenser E in fig.2 let a single discharge be first considered. the discharge has 2 paths offered~~ one to the condenser E the other through the part L of the working circuit C. The part L  however  by virtue of its self induction  offers a strong opposition to such a sudden discharge  wile the condenser on the other hand offers no such opposition ......TESLA..

THE !STORE IS UP AND RUNNING ...  WE ARE TAKEING ORDERS ..  NOW ..   ISTEAM.CA   AND WE CAN AND WILL BUILD CUSTOM COILS ...  OF   LARGER  OUTPUT ...

CAN YOU SAY GOOD BYE TO YESTERDAY?!?!?!?!

starcruiser

@IS,

As for a scope look for the frequency range it can support (Horiz time base), the vertical deflection, i.e. voltage per div setting, and of course dual, triple or quad trace. Some scopes offer a basic setup (just the basic Horiz and Vertical settings) and some offer built in functions such as DVM, Freq counter, screen capture and delta functions.

At the least I would say make sure your scope has at least 20 to 60Mhz of BW and can support 500 to 1000V for its vertical deflection (that is 50 or 100 v per div on the vertical setting).

I would get the scope with the largest possible vertical deflection and the highest BW you can afford.

The better the freq and voltage range as well as the more additional features (i.e. DVM, Freq counter, etc...) the more expensive it will be.

If you can find a used Sencor scope you might like these, I have one, since they are designed for consumer electronics and can support 2kv vertical and 60Mhz BW (TV repair) with other bells and whistles such as Delta Time and Freq functions as well as built in DVM and Freq counter that goes to 100Mhz.

Just need to shop around to find the one you want/need.
Regards,

Carl

giantkiller

Quote from: joe dirt on June 12, 2007, 04:05:57 AM
How about 90 minutes  ::)


(this message will self delete in 24 hours)


Sir Dirt


Quote from: giantkiller on June 11, 2007, 12:39:45 PM
Yo Dudes!
I love these dreamscape adventures!

The Morse code protocol is based in the spacing between the clicks. Tesla showed that the kick or spark itself is an encyclopedia just waiting to be utilized between the pages/frequencies/harmonics. See that?

Let's throw another one out there.
I plan to pull my house off the grid in 90 days or 1 circuit or pull 1 fuse and feed that isolated circuit with an inverter from a tpu. I do not plan to interface with the grid by pumping power back into the power companies. This approach is the avenue to the mass market.

--giantkiller. What reality do you want?

LOL. Cute comeback!