Hello, (This work was done 05.Dec.2007)
I've almost finished the steel construction part. The base was made 1000 x 1000 mm. Here are some pictures of how I continued construction::
All square tubes that go toward the apex need to be cut at a 45? angle. So I measured the diagonal of the tube:
(https://overunityarchives.com/proxy.php?request=http%3A%2F%2Fi33.photobucket.com%2Falbums%2Fd81%2Femibre%2FPyramid%2F02diagonal.jpg&hash=023ed5bdfe0af70a76c7147c574508dddf7e940d)
Out of experience I know that I should cut more just to be on the safe side, so I used the measurement 27mm instead of 26.4mm.
(https://overunityarchives.com/proxy.php?request=http%3A%2F%2Fi33.photobucket.com%2Falbums%2Fd81%2Femibre%2FPyramid%2F0327mmline.jpg&hash=8c300cc0bebbc9351b962af6d47d6edd488743fe)
I took my angle grinder and cut the 45? angle:
(https://overunityarchives.com/proxy.php?request=http%3A%2F%2Fi33.photobucket.com%2Falbums%2Fd81%2Femibre%2FPyramid%2F04flex45degrees.jpg&hash=77cfe2dd45dbc79d6d59d9fcfcd3deb25c950cb6)
A 45? angle was cut on both sides of the square tubes:
(https://overunityarchives.com/proxy.php?request=http%3A%2F%2Fi33.photobucket.com%2Falbums%2Fd81%2Femibre%2FPyramid%2F05tubescut45.jpg&hash=f9b7b50de879f114cf597d8b3f090bfef422125e)
I found the center of the base and drilled a hole in the wood to support my 3/8 inch pluming pipe.
(https://overunityarchives.com/proxy.php?request=http%3A%2F%2Fi33.photobucket.com%2Falbums%2Fd81%2Femibre%2FPyramid%2F06Centerpipe.jpg&hash=ff43f6dfc42d58c0c0dcedd40a2e195643ab42a1)
As I suspected, the measurement 27mm instead of 26.4mm worked great. Only problem now is that the center pipe (17mm) is smaller than the diagonal of the square pipes (26.4mm).
(https://overunityarchives.com/proxy.php?request=http%3A%2F%2Fi33.photobucket.com%2Falbums%2Fd81%2Femibre%2FPyramid%2F07greatangle.jpg&hash=f27d4411df369eab530555b66c7dc658c467f259)
This is why we need to cut the ears off of the 45? angle on the square tubes. Don't cut too much! You can always cut more if needed.
(https://overunityarchives.com/proxy.php?request=http%3A%2F%2Fi33.photobucket.com%2Falbums%2Fd81%2Femibre%2FPyramid%2F08earscutoff.jpg&hash=869caa99d8d451033be8a7195b41c17945dd09fc)
Now we need 2 more pipes and the jigsaw puzzle will be complete.
(https://overunityarchives.com/proxy.php?request=http%3A%2F%2Fi33.photobucket.com%2Falbums%2Fd81%2Femibre%2FPyramid%2F09waitingforsidetubes.jpg&hash=2a3ac0902ff1803d44cb46ce4b55ad50a81af5d8)
Finished pyramid. I was surprised that the base stayed exactly square. Was I just lucky? I don't know.
(https://overunityarchives.com/proxy.php?request=http%3A%2F%2Fi33.photobucket.com%2Falbums%2Fd81%2Femibre%2FPyramid%2F10finalproduct.jpg&hash=c309d7557f0e1f62e87553f8d67ac30f8470e43e)
Here's how the top looks. I must say that we really shouldn't make a big fuss out of all the mathematics. Just DO IT and everything will fall into place.
(https://overunityarchives.com/proxy.php?request=http%3A%2F%2Fi33.photobucket.com%2Falbums%2Fd81%2Femibre%2FPyramid%2F11apex.jpg&hash=2529af51d5eedb1c73476a17067eb5685158de63)
Best regards
2toxic4u
Hello everybody, (this work was done 06.Dec.2007)
Today I colored my frame with black spray paint.
Then I made 3 of the sides out of a Rigips plate. I screwed the plaster plates onto the frame with 6 screws on each plate.
(https://overunityarchives.com/proxy.php?request=http%3A%2F%2Fi33.photobucket.com%2Falbums%2Fd81%2Femibre%2FPyramid%2F3Rigipsplates.jpg&hash=b73269c1c56b45171b7920400effc726628e35ce)
Here's a short video ? just for fun
http://s33.photobucket.com/albums/d81/emibre/Pyramid/?action=view¤t=Coveringthepyramid.flv
Best regards
2toxic4u