Overunity.com Archives is Temporarily on Read Mode Only!



Free Energy will change the World - Free Energy will stop Climate Change - Free Energy will give us hope
and we will not surrender until free energy will be enabled all over the world, to power planes, cars, ships and trains.
Free energy will help the poor to become independent of needing expensive fuels.
So all in all Free energy will bring far more peace to the world than any other invention has already brought to the world.
Those beautiful words were written by Stefan Hartmann/Owner/Admin at overunity.com
Unfortunately now, Stefan Hartmann is very ill and He needs our help
Stefan wanted that I have all these massive data to get it back online
even being as ill as Stefan is, he transferred all databases and folders
that without his help, this Forum Archives would have never been published here
so, please, as the Webmaster and Creator of these Archives, I am asking that you help him
by making a donation on the Paypal Button above.
You can visit us or register at my main site at:
Overunity Machines Forum



Quantum Energy Generator (QEG) Open Sourced (by HopeGirl)

Started by madddann, March 26, 2014, 09:42:27 PM

Previous topic - Next topic

0 Members and 111 Guests are viewing this topic.

ACG

Hopegirl put up another long long long winded post at her wordpress page.  I can tell is full of B.S by a quick blink look at it. 
Will return after I wade through its muck.

ACG

Quote from: BeDoCuckoo on July 15, 2014, 11:30:09 PM
Here is a video of Orlando's QEG converting VAR's into Real Power, by using a transformer as in Herm's paper.

I misstated in the video 50 degrees out of phase it was actually 90 degrees out of phase until I added the transformer.

Please forgive the poor quality of these videos and having to be in 2 parts.

http://i-uv.com/latest-test-from-orlando-qeg-quantum-energy-generator/

We know.  About a full page of analyzing of that post in this thread.  Sans (-) karma, warnings, and bans to boot, unlike some other places.

ACG

Quote from: TinselKoala on July 16, 2014, 02:09:57 PM
This whole affair shows what folly people are subject to.

I can't even imagine starting out on a project like this one, involving building large heavy rotating electrical assemblies expected to produce high voltage at a resonant frequency... without already having the appropriate test equipment and the knowledge to use it properly! Yet apparently people all over the world are doing that very thing, since the measurement kit has to be borrowed, flown in on an emergency basis... etc.  How does anyone really hope to be able to complete a QEG, tuning and self-running, without "50 thousand pounds" in test kit?  Don't worry, you can always have James sell you some of his knowledge at 300 dollars an hour. Be sure to ask him, though... why he hasn't applied all that knowledge to his own prototype to make it run itself.


I'd like to know the count of the failed cores. Three, or more? Somewhere I thought I had seen that the original Pennsylvania Prototype also shorted its core and needed rebuilding. Did the UK fully-potted core fail also, or was it another one?

Perhaps if the qeg did not use the degree of high voltage capacitors it could avoid the high voltage arcing and damage.  Use lower voltage higher farads and adjust the windings accordingly.  You know doing what is called designing and engineering.

MarkE

Quote from: ACG on July 16, 2014, 04:57:17 PM
Perhaps if the qeg did not use the degree of high voltage capacitors it could avoid the high voltage arcing and damage.  Use lower voltage higher farads and adjust the windings accordingly.  You know doing what is called designing and engineering.
The problem is that they have built a machine that rather uselessly stores energy in a relatively high Q tank circuit and the means of limiting the energy is voltage breakdown.  They have demonstrated multiple times that the breakdown can be the primary insulation in the core causing permanent damage, or preferentially a spark gap.  In both cases, they store and then discard energy.  It makes a light show.  It does not generate free energy.

ACG

Finally finished reading her B.S. at http://hopegirl2012.wordpress.com/2014/07/16/transparent-assessment-of-challenges-faced-during-ftw-qeg-3-month-global-build-tour-plus-target-date-for-phase-3-self-running-completion/comment-page-1/#comment-6772

Most of it is a repeat of her prior post.  Some high lights for those who have a mind to question:

QuoteIt took three weeks to prepare the space for the UK build and order all the parts. This included building a workshop from scratch, ordering a core and having it shipped from the US, and carefully ordering all the other parts.
Could it be the construction and erection of 11 (eleven) gongs and overhead drapes that caused the delay in preparing?

Quote
One of the engineers at the UK build was invited because he was going to bring the transverter. He came with something else that he thought would do the same thing: a Marcov coil.
You mean to tell me the communication between your people is that bad?  Could not confirm who was to bring what?  And why not bring both items?  Repeat, why not bring both items?  I cannot believe that.  This is equivalent to bringing a Dentist to a heart transplant.  And for you be-do folks, do you understand that no coil was brought over?  This implemented Marcov coil is an assembled coil, wrapped around the qeg.  If anything arrived it may have been a SPOOL of WIRE which surely already existed in the makeshift lab of parts donated by the biggest systems development companies in the world (add on going delusions of grandeur) http://hopegirl2012.wordpress.com/2014/05/25/qeg-3rd-phase-development-self-running/.  Technically this Engineer did not hold their end of the bargain.  I find it amazing how the very purpose of UK build was to use a transverter but said transverter was not used and was not present.  Next time you turn on a fan to cool off, put a heater in front of the air flow.  Do you feel my amazement?

QuoteAssembly commenced on the 4th day (assembly takes 3-4 days to complete) but on the fifth day we had special guests come to the build to conduct an unexpected spiritual business exercise. This took up the entire day.
A.k.a. a smoke out.

QuoteOn his last day, James worked late into the night on tuning the exciter coil. He was literally hours away from self-running when he had to leave the UK. Again, he could not finish phase 3 because we ran out of time.
If James was once HOURS away from self running, then James should then be SECONDS away by now in Pennsylvania.  A week has passed.  Where is the self running?  And while we are on this topic and James is in the states why not take this approach.  Use one of the many free live stream web services to film, demo, and teach not just free energy enthusiast in the states but all over the world?  This would not cost $20,000.  Second input, invite over said enthusiast locally to personally view, assist, and improve on the design.  This would not cost $4,000 in plane tickets.

QuoteData results in U.K.
Wait, such a thing was not provided in the wordpress update.  Shucks.


I do not blame the qeg team for lies.  I blame the donators.  Time after time they are feed a spoon of b.s. and they swallow it smiling followed by the usual "Thank!! You!!".  I wonder what will fill the spoon to feed the mouths of the donators come August 2014.  Hopegirl again promises self running end of July.  I promise you another long long long winded write up from her end of July.