Overunity.com Archives is Temporarily on Read Mode Only!



Free Energy will change the World - Free Energy will stop Climate Change - Free Energy will give us hope
and we will not surrender until free energy will be enabled all over the world, to power planes, cars, ships and trains.
Free energy will help the poor to become independent of needing expensive fuels.
So all in all Free energy will bring far more peace to the world than any other invention has already brought to the world.
Those beautiful words were written by Stefan Hartmann/Owner/Admin at overunity.com
Unfortunately now, Stefan Hartmann is very ill and He needs our help
Stefan wanted that I have all these massive data to get it back online
even being as ill as Stefan is, he transferred all databases and folders
that without his help, this Forum Archives would have never been published here
so, please, as the Webmaster and Creator of these Archives, I am asking that you help him
by making a donation on the Paypal Button above.
You can visit us or register at my main site at:
Overunity Machines Forum



Plasma Electrolysis by IronHead

Started by IronHead, March 08, 2007, 06:31:51 PM

Previous topic - Next topic

0 Members and 3 Guests are viewing this topic.

Moab

Est cost of build

1 Grundfus pump.                 60.00
1 fiberglass H-W, Rv tank           25.00 (Salvage yard)
1 4''X18" stainless nippel 188wall  32.00
1 limit switch                            10.00
1 DC Pwm. 50amp 1 Khz 600 Khz          Built it so i dontknow Maybe 50.00?
Misc 1'' stainless fittings about    45.00
312. 2''X4'' screen 4 Pak            16.00
1 45 amp Bridge. Out of the junk box 10.00 ?
Misc copper for plumbing            60.00 maybe
Tungston I used 1/4''                 22.00 10 pak
Misc magnetic chokes.Again i built them Maybe 5.00?
Heat exchanger Ebay                  35.00 use a radiator for forced air heat
52 gallon H-W tank  You dont need it if you dont do the floor heat

4  3/4''flow controll valves          32.00 
Gas volume controll                    7.00 

1/4'' nylon hose for venting gas   5.00   

So you can see there is a good bit to the build. if your going to do it, gather up all the stuff youre going to need. I'm sure i missed some things. Its cheaper than building a conventional boiler. But then again I didnt do it beacuse its cheap. what i learned from the build is priceless. If you go in to it whith that attitude you cant loose.  ;)
Since youre not doing the radient floor heat your build will be a little different, But not much. happy build planing. 8)  Moab.

IronHead

Thanks Moab for taking this thread, I just don't have the time.
Again thank you.

IronHead

Moab

You're welcome Buddy.. Just dont let me make any stupid mistakes. :o. LOL

Koko. On the pulsed vrs rectifyied.. From what i see the rec seems to spark up better. So what i do is let it run on the DC 120hz then after every thing is heated up. I switch to the PWM. This i find works well and also seems to make the screen and rod last longer. The freq +-+-+-Flipped and is between 12 and 27 Khz. It is always different after a change out, like i said. So you need to tune it every time. So they both work. but after she heats up the SQ wave is the way to go for the 14 day run. I'm still learning as i go. So dont think me an expert. :) Just a builder.

IronHead

The more you work with this cell the more it will teach you.  In the long run it will be simplified as it will show you in time.



Robb077

Moab:
Great detail....thanks for the post!